NLNG Train 7 Project jobs opportunities

NLNG Train 7 Project has a lot of jobs and contract opportunities for local Nigerians and local contractors/ suppliers.

What is NLNG Train?

Nigeria LNG Limited (NLNG) Train is liquefied natural gas plant’s liquefaction and purification facility located in Bonny Island Rivers State, South South Nigeria. Before now, NLNG have Train 1 to Train 6 (6 Trians).

NLNG has plants that consist of trains that convert natural gas into liquefied natural gas. A typical train consists of a compression area, propane condenser area, methane, and ethane areas.

NLNG Train 3

NLNG Train 3
NLNG Train 3

What is NLNG Train 7 Project?

NLNG Train 7 Project is a project plan for the sustainability of its operations and expansion project which will increase NLNG’s production capacity from 22 Million Tonnes Per Annum (MTPA) to 30 MTPA. NLNG is a mid-stream company that has monetised over 5.96 Trillion cubic feet (Tcf) of Associated Gas (AG) which would have otherwise been flared.

Nigeria LNG Limited (NLNG) is an independent Incorporated Joint Venture owned by the Federal Government of Nigeria, represented by the Nigerian National Petroleum Corporation, NNPC (49%), Shell Gas B.V. (25.6%), Total Gaz Electricite Holdings France (15%), and Eni International (10.4%).

As NLNG Train 7 Project is a plan for the sustainability of its operations and expansion project which will increase NLNG’s production capacity to 30 MTPA. Late 2018, at a Final Investment Decision (FID), NLNG is seeking $7 billion from the global financial markets for the Train 7 Project.

NLNG Train 6

NLNG Train 6

At an opening ceremony to source fund for NLNG Train 7 Project, Tony Attah, revealed that funds being sought will cover the company’s expansion program (construction of Train 7) and investment in the upstream gas sector in Nigeria that will ensure the sustainability of feed gas supply to its existing trains (Trains 1 to 6) and the new Train 7.

NLNG TRAIN 7 PROJECT LOCAL CONTENT PLAN.

In order to follow abide on Nigerian Oil and Gas Industry Content Development Act 2010, the NIGERIAN CONTENT DEVELOPMENT and MANAGEMENT BOARD with

NLNG has set up plans to maximise the utilization of Nigerian manufacturers, fabricated and assembled equipment, materials and services.

NLNG TRAIN 7 PROJECT LOCAL JOBS/ CONTRACTS:

NLNG Train 7 Project jobs and opportunities

NLNG Train 7 Project Local Content Plan has the following opportunities for Local Contractors and suppliers.

1. New Flare Systems

2. Complete Train

3. Third NLNG Jetty

4. Supporting On-site Infrastructure

5. Common Liquefaction Unit (CLU)

6. Tie-ins to the existing Plant

OTHER TRAIN 7 PROJECT LOCAL OPPORTUNITIES:

  • Fabrication and construction of non-cryogenic, pressure vessels and heat exchangers.
  • Assembly of non-cryogenic valves, pumps and associated facilities.
  • Pipelines systems fabrication and construction, cable laying, coating etc.
  • Jetty construction and export/ loading and offloading systems for NLNG and her associated products.
  • Paints manufacturing/ supply, electric cables, foundry materials, sacrificial anodes etc.
  • Oil and Gas Training and Certification.
  • Installation, hook-up and commissioning
  • Civil construction of temporary and permanent structures.
  • Health, Safety and Environment Management Services
  • Material procurement and supply services
  • Process automation and control/ information; Systems/ Information Technology/ Radio and Communication Services
  • Inspection, Testing and Certification Services
NLNG Train 7 Project jobs and contract opportunities

MAJOR MANDATORY REQUIREMENTS FOR INTERESTED LOCAL CONTRACTORS

Follow us for more update on NLNG Train 7 Project and Job opportunities.

Feel free to share